Diversion Description: The diversion gate structure consists of a concrete headwall with two 5 foot steel slide gates. Water is diverted from a side channel of the Bear River.
Bear Canal diversion structure
Diversion Location: Diversion is located on the Upper Bear in Wyoming. Irrigated lands are located in Wyoming as shown in the location map hereafter.

Latitude N 40° 59' 56.3"
Longitude W 110° 52' 23.9"

Conveyance Description: Open channel canal, approximately 42,240 feet in length.1

Direct Flow Water Rights:2

Priority Date Permit
Number
Permitted Use Permitted
Acres
Flow
(CFS)
Cumulative
(CFS)
Comments
05-15-1882 Terr Irrigation 140 2.00 2.00 Acocks & Cowlisham
Fall-1883 Terr Irrigation 127 1.81 3.81 Blight Irr.
Fall-1883 Terr Irrigation 10 0.14 3.95 Blight Irr.
Fall-1883 Terr Irrigation 71 1.01 4.96 Blight Irr.
Fall-1883 Terr Irrigation 23 .33 5.29 Blight Irr.
07-20-1885 Terr Irrigation 93 1.32 6.61 Coles>Island
-1885 Terr Irrigation 70 1.00 7.61 Island
08-24-1904 6277 Irrigation 29 0.41 8.02
08-24-1904 6277 Irrigation 40 0.57 8.59
08-24-1904 6277 Irrigation 278 3.97 12.56
08-24-1904 6277 Irrigation 40 0.57 13.13
08-24-1904 6277 Irrigation 160 2.28 15.41
08-24-1904 6277 Irrigation 160 2.28 17.69
08-24-1904 6277 Irrigation 20 0.28 17.97
08-24-1904 6277 Irrigation 120 1.71 19.68
08-24-1904 6277 Irrigation 120 1.71 21.39
08-24-1904 6277 Irrigation 160 2.28 23.67
08-24-1904 6277 Irrigation 40 0.57 24.24
08-24-1904 6277 Irrigation 160 2.28 26.52
08-24-1904 6277 Irrigation 280 4.00 30.52
08-24-1904 6277 Irrigation 320 4.57 35.09
08-24-1904 6277 Irrigation 30 0.43 35.52
08-24-1904 6277 Irrigation 40 0.57 36.09
08-24-1904 6277 Irrigation 160 2.28 38.37
08-24-1904 6277 Irrigation 300 4.28 42.65
08-24-1904 6277 Irrigation 200 2.85 45.50
08-24-1904 6277 Irrigation 200 2.85 48.35
08-24-1904 6277 Irrigation 120 1.71 50.06
08-24-1904 6277 Irrigation 80 1.14 51.20
08-24-1904 6277 Irrigation 240 3.42 54.62
08-24-1904 6277 Irrigation 400 5.71 60.33
08-24-1904 6277 Irrigation 160 2.28 62.61
08-24-1904 6277 Irrigation 240 3.42 66.03
08-24-1904 6277 Irrigation 80 1.14 67.17
05-17-1930 4718E Supplemental Supply 305.80

Clark-Titmus (Bazoo Hallow Cr.)
05-17-1930 4719E Irrigation 9.10 0.13 67.30
05-17-1930 4719E Irrigation 23.80 0.34 67.64
05-17-1930 4719E Irrigation 25 0.36 68.00
05-17-1930 4719E Irrigation 15 0.21 68.21
05-17-1930 4722E Irrigation 154.80 2.21 70.42
05-17-1930 4723E Irrigation 158.40 2.26 72.68
05-17-1930 4725E Irrigation 83.10 1.18 73.86

Associated Storage Rights:2

Reservoir Shareholder Volume
(Acre-ft)
Est. % of Shares
Used this Diversion3
Comments
Whitney Bear Canal 1102.5 100%
Whitney Brent Barker 50 100%
Whitney Joe Barker 100 100%
Sulphur Creek Kyle Lowham 26 50% By Exchange
Sulphur Creek Carl Lym 36 100% By Exchange
Sulphur Creek Devan Moss 50 100% By Exchange


click to enlarge

Irrigation Practices: Land is all flood irrigated.3

Estimated Diversion Efficiency: Canal losses are relatively high due to porous nature of soils in the higher reaches of the Upper Bear.

Calculated Diversion Efficiency = Conveyance Efficiency X Application Efficiency:
Conveyance Efficiency: 40%
Application Efficiency: 55%
Overall Diversion Efficiency: 22%

Conveyance efficiency is estimated by total length of main canal. Application efficiency for flood irrigation and sprinkler irrigation is estimated at 55% and 85% respectively.

Crop Types / Consumptive Use: Water is used entirely to irrigate mixed meadow grasses, primarily Meadow Foxtail, etc.3

Return Flows: Return flow is split between the Sulphur Creek Reservoir (approx. 60%) and Sulphur Creek below the reservoir (approx. 40%).

The following return flow pattern was adopted for modeling in this study are as follows:

              Month
      (after initial Diversion)	 Percent of Return
		0			50%
		1			25%
		2			15%
		3			10%

Other Operational Information: The Bear Canal operates year-round for stock watering in the Hilliard area during the winter months.3

References:

  1. USDA -Soil Conservation Service Economic Research Service-Forest Service in Cooperation with the States of Idaho, Utah, Wyoming, Irrigation Conveyance Systems, Working Paper for the Bear River Basin Type IV Study, Idaho-Utah-Wyoming, April 1976

  2. Water rights summary obtained from State Engineer Interstate Reglist – revised April 14, 1999

  3. Irrigation practices based on field investigation and interview with Mr. Don Shoemaker, Water Hydrographer-Commissioner – October 29, 1999.

  4. State of Utah Natural Resources, Water Budget Studies – Utah, Bear River Study Area, September 1994


Monthly Diversion Records
Bear Canal

YEAR MAY JUNE JULY AUGUST SEPTEMBER
Total of Daily Ave for Month Average
CFS
Monthly Total
Ac-Ft
Total of Daily Ave for Month Average
CFS
Monthly Total
Ac-Ft
Total of Daily Ave for Month Average
CFS
Monthly Total
Ac-Ft
Total of Daily Ave for Month Average
CFS
Monthly Total
Ac-Ft
Total of Daily Ave for Month Average
CFS
Monthly Total
Ac-Ft
1970
0.0 0.0
0.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0
1971 0 0.0 0.0 1467 48.9 2909.8 2448 79.0 4855.5 828 26.7 1642.3 738 24.6 1463.8
1972 241 7.8 478.0 2255 75.2 4472.7 1953 63.0 3873.7 432 13.9 856.9 379 12.6 751.7
1973 366 11.8 726.0 1723 57.4 3417.5 1124 36.3 2229.4 234 7.5 464.1 180 6.0 357.0
1974 149 4.8 295.5 2662 88.7 5280.0 1366 44.1 2709.4 245 7.9 486.0 403 13.4 799.3
1975 75 2.4 148.8 1094 36.5 2169.9 1926 62.1 3820.2 745 24.0 1477.7 871 29.0 1727.6
1976 322 10.4 638.7 1781 59.4 3532.6 770 24.8 1527.3 262 8.5 519.7 223 7.4 442.3
1977 1024 33.0 2031.1 671 22.4 1330.9 239 7.7 474.0 265 8.5 525.6 255 8.5 505.8
1978 201 6.5 398.7 2157 71.9 4278.3 1674 54.0 3320.3 212 6.8 420.5 726 24.2 1440.0
1979 442 14.3 876.7 2187 72.9 4337.9 1130 36.5 2241.3 261 8.4 517.7 211 7.0 418.5
1980 27 0.9 53.6 1584 52.8 3141.8 1608 51.9 3189.4 290 9.4 575.2 395 13.2 783.5
1981 47 1.5 93.2 1834 61.1 3637.7 947 30.5 1878.3 114 3.7 226.1 378 12.6 749.8
1982 494 15.9 979.8 1891 63.0 3750.7 1743 56.2 3457.2 467 15.1 926.3 1000 33.3 1983.5
1983 54 1.7 107.1 237 7.9 470.1 1862 60.1 3693.2 560 18.1 1110.7 328 10.9 650.6
1984 0 0.0 0.0 841 28.0 1668.1 2304 74.3 4569.9 837 27.0 1660.2 579 19.3 1148.4
1985 397 12.8 787.4 2079 69.3 4123.6 1207 38.9 2394.0 420 13.5 833.1 285 9.5 565.3
1986 740 23.9 1467.8 2014 67.1 3994.7 1219 39.3 2417.9 359 11.6 712.1 821 27.4 1628.4
1987 598 19.3 1186.1 1712 57.1 3395.7 554 17.9 1098.8 97 3.1 192.4 502 16.7 995.7
1988 1236 39.9 2451.6 1783 59.4 3536.5 1362 43.9 2701.5 184 5.9 365.0 118 3.9 234.0
1989 598 19.3 1186.1 1712 57.1 3395.7 554 17.9 1098.8 97 3.1 192.4 167 5.6 331.2
1990 1006 32.5 1995.4 1931 64.4 3830.1 1537 49.6 3048.6 255 8.2 505.8 83 2.8 164.6
1991 117 3.8 232.1 2989 99.6 5928.6 1600 51.6 3173.6 304 9.8 603.0 444 14.8 880.7
1992 1346 43.4 2669.8 2061 68.7 4087.9 642 20.7 1273.4 334 10.8 662.5 290 9.7 575.2
1993 233 7.5 462.1 1838 61.3 3645.6 2258 72.8 4478.7 434 14.0 860.8 232 7.7 460.2
1994 1210 39.0 2400.0 1821 60.7 3611.9 794 25.6 1574.9 368 11.9 729.9 206 6.9 408.6
1995 216 7.0 428.4 1426 47.5 2828.4 2118 68.3 4201.0 667 21.5 1323.0 1094 36.5 2169.9
1996 470 15.2 932.2 2063 68.8 4091.9 1864 60.1 3697.2 207 6.7 410.6 884 29.5 1753.4
1997 436.3 14.1 865.4 1894 63.1 3756.7 1830.2 59.0 3630.1 262.9 8.5 521.5 406.8 13.6 806.9
1998 421.3 13.6 835.6 1396 46.5 2768.9 2267 73.1 4496.5 532 17.2 1055.2 920 30.7 1824.8
1999 388 12.5 769.6 1873 62.4 3715.0 2041 65.8 4048.3 313 10.1 620.8 528 17.6 1047.3

AVERAGES
14.3 879.2
58.6 3486.5
47.8 2937.0
11.8 724.0
15.7 933.4