I. Welcome
Jodie Pavlica, Wyoming Water Development Office, called the meeting to order at approximately 6:00 p.m. All attendees introduced themselves, followed by a review of the overall meeting agenda. A sign-in sheet was passed around to record attendance.

II. Basin Plan Update Presentation
Jerry Gibbens, MWH, was introduced as being part of the consultant team that is preparing the surface water portion of the Basin Plan Update. Mr. Gibbens described the progress on both Task 3, Surface Water Profile, and Task 4, Available Surface Water Determination.

Within Task 3, a draft of the Water Law and Water Administration technical memorandum has been submitted to the WWDO for review. Work is wrapping up on the Municipal and Domestic Water Use, Industrial Water Use, Recreation and Environmental Water Use and Water Use from storage technical memorandums. Technical work is progressing on the Agricultural Water Use sub-task. The Basin Advisory Group Water Related Concerns technical memorandum will commence following the current BAG meeting so that it is available in draft form for the next BAG meeting.

Task 4 progress includes the development and population of a hydrology database, summarization of historical data and development of dry-average-wet year hydrology. A draft of tech memo 3A - Surface Water Hydrology, is currently underway. Work on the StateMod sub-task has been postponed indefinitely by WWDO until internal decisions are made regarding the appropriate model for use within the State and within the Wind-Bighorn basin. WWDO and the consultant team are currently working to develop alternatives to its implementation.

A summary of historical hydrology was also provided, focusing on how the addition of 2002 through 2008 hydrology data affects the dry-average-wet year hydrology used in the spreadsheet models. In general, averages decrease in all data sets. However, there are cases when dry-year hydrology increased, while average and wet year average decreased due to the inclusion of different hydrology years in each hydrologic group.

It was suggested that the memorandums prepared as part of Task 3 provide a description of federal laws (i.e. Bureau of Reclamation laws) that pertain to administration with the basin.

The consultants should ensure that the discussion in the Environmental Water Use memorandum on instream flow rights include a discussion of Federal reserved .bypass flow. rights that are a part of the Phase II adjudication.

Ed Harvey provided a general description of activities on Task 5, Demand Projections. Demands are being quantified within each major economic sector (e.g. agricultural, energy, industry, tourism, etc.) 50 years into the future. Mr. Harvey would appreciate any information on expected future economic activities within any of these sectors.

III. Tribal Water Plan
Kate Vandemoer, Ph.D., was introduced as a consultant to the Northern Arapahoe Tribe and gave a presentation. Ms. Vandemoer introduced Baptist Weed, Mitch Cottenoir and James Pogu who were also in attendance representing the Tribes. Ms. Vandemoer gave a presentation on the Draft Tribal Water Plan called .Our Water, Our Future, 500,000 af..

Research & activities that were conducted during development of the Tribal Water Plan include:

There are several issues in the use of the awarded water rights that have been considered.

The Water Plan is a plan for the use of water. There are three phases of water development included in the plan:

What's next? Choices, decisions, strategy, community and planning. Why does it take so long? Because water is connected to everything: control of assets, spirituality, kinship and personal efficacy.

Sequence of development: Riverton East (within next few years), storage near Steamboat Butte (or other storage projects above Diversion Dam), possible irrigation diversions. Under a full development situation, Tribes could divert 630 cfs out of the Wind River. The Tribes do not have a .use it or lose it. rule. Some small storage projects could be easier to construct than fewer larger reservoirs.

The Tribal Water Code does not have a one-fill rule. Some reservoirs could be filled more than once by adjusting administration.

Rehabilitating Wind River Irrigation Project could save tens of thousands or even 100,000 acre-feet. Tribes currently have about $7.5 million dollars from the federal government and the Wyoming Water Development Commission for irrigation system improvements.

IV. Groundwater Update
Scott Quillian from the WSGS was introduced to the group. He will assume the lead role in updating the groundwater portion of the basin plan update. Mr. Quillian passed around booklets containing a compilation of maps that have been produced to date for the work. Scott then reviewed the scope of work for the GW study.

Mr. Quillian presented a map of the basement geology for the entire state. This will be incorporated into the Basin Plan update. Several general cross-sections of the Wind River and Bighorn Basins, and percentages of aquifers within major geologic structures, were presented.

Overall, the study is progressing. Aquifers in the basin are being inventoried and characterized from the available data.

V. Public Comment
The following public comments were provided:

VI. Next Meeting
The next meeting is scheduled for Thursday, September 17, 2009 at 6:00 p.m. in Powell. The location is to be determined.