Match: Format:
 
  News   Pilot Products   Basin Plans   Contact Us   Home       

WIND/BIGHORN RIVER BASINS, WYOMING BIBLIOGRAPHY
WYOMING WATER DEVELOPMENT OFFICE
WATER DEVELOPMENT PROGRAM PROJECT REPORTS

AIRPORT BENCH

Engineering Associates. Airport Bench Water Supply Project Phase II Executive Summary, November 8, 1990.

___. Airport Bench Water Supply Project Phase II, Report, November 8, 1990.

BASIN, TOWN OF

Russell L. Donley & Associates, Inc. Preliminary Engineering Report for an Earth Reservoir and Irrigation System for the Town of Basin, Wyoming, December, 1983.

BASIN/BIG HORN

Crank Companies, Inc. Basin/Big Horn Rehabilitation Project Level II, November 2, 1990.

___. Executive Summary for Basin/Big Horn Rehabilitation Project - Level II, November 2, 1990.

BENCH CANAL

Nelson Engineering. Bench Canal Rehabilitation Project, Level II, November, 1991.

BIG HORN BASIN

HDR Engineering, Inc. Guidebook for Water Resources Management & Development, Big Horn & Clarks Fork Basins, Final Report, October, 1988.

Wyoming Water Research Center. Appendix E, Wirsos Model Runs.

Engineering Associates. Big Horn Basin Rural Water Supply, Phase 1 Report, January 10, 1989.

___. Big Horn Basin Rural Water Supply Project, Phase II Executive Summary, December 31, 1990.

___. Big Horn Basin Rural Water Supply Project, Phase II Final Report, December 31, 1990.

___. Big Horn Basin Rural Water Supply Project, Phase II Final Report, Appendix J, Expanded Systems Analysis, May 5, 1992.

Nelson Engineering. Big Horn Canal Feasibility Analysis, Level II, Executive Summary, June, 1994.

___. Big Horn Canal Feasibility Analysis, Level II, Phase II Final Report, June, 1994.

BLACKWILLOW

BRS, Inc. Black Willow Water Supply Project, Thermopolis, Wyoming, Level I - Executive Summary, November, 1995.

___. Black Willow Water Supply Project, Thermopolis, Wyoming, Level I - Final Report, November, 1995.

BUFFALO BILL DAM

U.S. Department of the Interior, Bureau of Reclamation. Feasibility Report on Modification of Buffalo Bill Dam, May, 1974, (Revised August, 1975).

___. Final Environmental Impact Statement On Modification of Buffalo Bill Dam, February, 1981.

____. Modification of Buffalo Bill Dam, September, 1982.

Buffalo Bill Dam Negotiating Committee. Buffalo Bill Dam, (This is a report to the Legislature and Governor), December, 1982.

U.S. Bureau of Reclamation. Supplement to Definite Plan Report Modification of Buffalo Bill Dam, September, 1983, (Revised March 1985).

BURLINGTON, TOWN OF

MSE-HKM, Inc. Burlington Water Supply Project Phase II Level II, Executive Summary, December, 1996.

___. Burlington Water Supply Project Phase II Level II, Technical Report, December, 1996.

CLARKS FORK

U.S. Department of the Interior, Bureau of Reclamation, Region 6. Report on Clarks Fork Division, Wyoming and Montana Missouri River Basin Project, 1957.

Tudor Engineering Company. Clarks Fork Hydroelectric Development, Reconnaissance Geology Report, October, 1981.

Wyoming Water Development Commission. Pre-Level I Analysis of Water Development Potential, Clarks Fork River, no date.

ESA Geotechnical Consultants. Big Horn Basin - Clarks Fork, Level II, Phase 1: Interim Report on Geotechnical Analysis, January, 1985.

___. Big Horn Basin - Clarks Fork, Level II, Executive Summary, April, 1986.

___. Big Horn Basin - Clarks Fork, Level II, Final Report on Project Analysis, April, 1986.

___. Big Horn Basin - Clarks Fork Level II Study, Final Report on Project Analysis, Pamphlet, April 18, 1986.

CODY, CITY OF

Engineering Associates. Cody Area Level II Water Supply Project, Executive Summary, May, 1996.

___. Cody Area Level II Water Supply Project, Final Report, May, 1996.

CODY-LAKEVIEW

James M. Montgomery, Consulting Engineers, Inc. Cody-Lakeview Irrigation Exchange Project - Level II, Investigation Report, January, 1986.

DUBOIS

James Gores and Associates. Dubois Area Water Master Plan - Level I Final Report, May, 1999.

GLOBE CANAL

James Gores and Associates. Globe Canal Investigations Level I Rehabilitation Plan, December, 1989.

___. Globe Canal Investigations Level II, Final Report, August, 1990.

___. Globe Canal Investigations Level II, Executive Summary, August, 1990.

GOOSEBERRY CREEK

Leonard Rice Consulting Water Engineers, Inc. Gooseberry Creek Water Resources Study, January, 1983.

Western Water Consultants, Inc. Final Report, Level II Feasibility Study, Gooseberry Creek Water Development Project, February 15, 1984.

___. Final Report, Level II Feasibility Study, Gooseberry Creek Water Development Project, Appendices, February 15, 1984.

___. Feasibility Report for Formation of Gooseberry Creek Irrigation District, Gooseberry Creek Water Development Project, April 16, 1984.

Morrison-Knudsen Engineers, Inc. Phase I Interim Report, Gooseberry Creek Level III Study, February, 1985.

International Engineering Company, Inc. Phase I, Part II, Gooseberry Creek Interim Report, Level III Project, January, 1986.

___. Gooseberry Level III Project, Executive Summary, January, 1986.

John From, M.A.I. Appraisal Report, Gooseberry Creek, State of Wyoming, July 21, 1986.

___. Appraisal Report, Gooseberry Creek, Baird Cattle Co., July 21, 1986.

___. Appraisal Report, Gooseberry Creek, Larsen Ranch Co., July 22, 1986.

___. Appraisal Report, Gooseberry Creek, C. A. Renner Ranch, July 22, 1986.

Frontier Archaeology. Final Report Archaeological Testing Program Wyoming Water Development Commission Upper Gooseberry Creek Dam and Reservoir Project, Park County, Wyoming, October, 1986.

Morrison-Knudsen Engineers, Inc. Gooseberry Level III Project, Phase II Summary Report, February, 1987.

GREYBULL, TOWN OF

Nelson Engineering. Greybull Water Supply Project, Level II, Executive Summary, November, 1995.

___. Greybull Water Supply Project, Level II, Final Design Report, November, 1995.

___. Greybull Water Supply Project, Level II - Phase II and III, Exploration Well and Conceptual Design, Executive Summary, September, 1997.

___. Greybull Water Supply Project, Level II - Phase II and III, Exploration Well and Conceptual Design, Final Report, September, 1997.

Engineering Associates. Town of Greybull Water Supply Project, Level II, Executive Summary, April, 1998.

___. Town of Greybull Water Supply Project, Level II, Final Report, April, 1998.

GREYBULL VALLEY

GEI Consultants, Inc. Phase I Draft Summary Report, Greybull Valley Dam and Reservoir Project, January, 1991.

___. Phase II Summary Report, Greybull Valley Dam and Reservoir Project, August, 1991.

___. Enclosures 1 through 3, Phase II Summary Report, Greybull Valley Dam and Reservoir Project, August, 1991.

___. Addendum No. 2 to Appendix A, Geotechnical Investigations Report of Alternative Borrow Sources on Private Property Downstream of the Lower Dam Site, Greybull Valley Dam and Reservoir Project, April, 1992.

Bureau of Reclamation, Department of Interior. Economic Evaluation, Greybull Valley Dam and Reservoir, Wyoming, January 1994.

HIGHLAND HANOVER IRRIGATION DISTRICT

Centennial Engineering & Research, Inc. Rehabilitation Feasibility Study, Highland Hanover Irrigation District, Executive Summary, November, 1988.

___. Rehabilitation Feasibility Study, Highland Hanover Irrigation District, Final Report, November, 1988.

U.S. Department of the Interior, Bureau of Reclamation. Report on Proposed Rehabilitation and Betterment Program, Highland-Hanover Irrigation District, Hanover Bluff Unit, Pick-Sloan Missouri Basin Program, August 25, 1989.

HUNT CANAL

Nelson Engineering. Hunt Canal Rehabilitation Project, Level II, Draft Rehabilitation Plan, July, 1989.

___. Hunt Canal Rehabilitation Project, Level II, Executive Summary, December, 1989.

___. Hunt Canal Rehabilitation Project, Level II, Final Design Plan, December, 1989.

IRON CREEK PROJECT

Harza Engineering Company. Interim Report to Shoshone and Heart Mountain Irrigation Districts and Wyoming Water Development Commission, Iron Creek Project Level II Feasibility Study, December, 1982.

___. Final Report to Shoshone and Deaver Irrigation District and Wyoming Water Development Commission, Corbett Dam and Tunnel Rehabilitation Study, September, 1983.

KIRBY DAM AND RESERVOIR

U.S. Department of Agriculture and Wyoming State Engineer's Office. Wyoming Cooperative Irrigation Water Conservation Study, Kirby Ditch Report, November, 1982.

HDR Engineering, Inc. Kirby Dam and Reservoir Level I Reconnaissance Study, January, 1990.

LAKEVIEW

J.M. Montgomery, Consulting Engineers. Lakeview Irrigation District Consumptive Use and Irrigation Demand at Cody, Wyoming, April 15, 1985.

___. Lakeview Irrigation District Value of Production with a Normal and Inadequate Water Supply at Cody, Wyoming, June 15, 1985.

JFC Engineers. Executive Summary for Lakeview Water Supply Project, Level II, November, 1998.

___. Final Report for Lakeview Water Supply Project, Level II, November, 1998.

___. Addendum to: Final Report for Lakeview Water Supply Project, Level II, December, 1998.

LANDER, CITY OF

ARIX Corporation. Lander Rehabilitation Project, Level II Feasibility Study, Phase I, Flood Routing and Incremental Damage Analysis, November, 1987.

___. Lander Rehabilitation Project, Level II Feasibility Study, Phase I, Flood Routing and Incremental Damage Analysis, Executive Summary, November, 1987.

___. Lander Rehabilitation Project, Level II Feasibility Study, Phase II, December, 1988.

___. Lander Rehabilitation Project, Level II Feasibility Study, Phase II, Executive Summary, December, 1988.

___. Lander Rehabilitation Project, Level II Feasibility Study, Phase II, Geotechnical Investigation and Rehabilitation Plan, Appendix III, Geotechnical Data and Analysis, December, 1988.

JFC Engineers, Architects, Surveyors. Appendix, Lander Water Supply Project Master Plan, Level I Report, 1996.

___. Lander Water Supply Project Master Plan, Level I Report, 1996.

Mariah Associates, Inc. Environmental Assessment, Worthen Meadows Reservoir Dam Rehabilitation Project, 1990.

Nelson Engineering. Lander Water Supply Project, Level II, Phase II Report, July, 1998.

___. Lander Water Supply Project, Level II, Phase II Report, Executive Summary, July, 1998.

___. Lander Water Supply Project, Level II - Phase III Final Report, Executive Summary, December, 1999.

___. Lander Water Supply Project, Level II - Phase III Final Report, December, 1999.

LANDER, CITY OF, TAYLOR DITCH REHABILITATION

GEI Consultants, Inc. City of Lander Taylor Ditch Rehabilitation Project, Level II, Feasibility Study, Phase II Report, November, 1998.

LECLAIR IRRIGATION

Crank Companies, Inc. LeClair Irrigation Rehabilitation Project Level II, Executive Summary, December, 1998.

___. LeClair Irrigation Rehabilitation Project Level II, Final Report, December, 1998.

MCNUTT WATER SUPPLY

BRS, Inc. McNutt Water Supply Project - Level II, Executive Summary, November, 1998.

___. McNutt Water Supply Project - Level II, Final Report, November, 1998.

MANDERSON WATER SUPPLY

Graham, Dietz & Associates. Manderson Level II Water Supply Study, Final Report, October, 1994.

___. Manderson Level II Water Supply Study, Appendix, November, 1994.

___. Manderson Level II Water Supply Study, Executive Summary, November, 1994.

MEETEETSE, TOWN OF

Gores, James, and Associates. Meeteetse Regional Water Supply, Master Plan - Level I, Executive Summary, October, 1995.

___. Meeteetse Regional Water Supply, Master Plan - Level I, Final Report, October, 1995.

Sear-Brown Group. Meeteetse Water Supply Project - Level II, Executive Summary, November, 1997.

___. Meeteetse Water Supply Project - Level II, Final Report, November, 1997.

NORTHERN WASHAKIE COUNTY

Nelson Engineering. Northern Washakie County Flood Control Study, Level I, November, 1988.

POWELL, TOWN OF

Engineering Associates. Powell Master Plan, Level I Study, Executive Summary, October, 2000.

___. Powell Master Plan, Level I Study, Final Report, October, 2000.

RED LANE REHABILITATION PROJECT

Civil Engineering Professionals, Inc. Inventory Report, Red Lane Rehabilitation Project, Level II, Feasibility Study, Phase I, September, 1989.

___. Executive Summary, Red Lane Rehabilitation Project, Level II Feasibility Study, September, 1990.

___. Final Report, Red Lane Rehabilitation Project, Level II Feasibility Study, December, 1990.

RIVERTON, CITY OF

Nelson Engineering. Riverton Water Supply Project, Level II, Phase I, January, 2000.

___. Riverton Water Supply Project, Level II, Phase II, Executive Summary, June, 2000.

___. Riverton Water Supply Project, Level II, Phase II, Final Report, June, 2000.

RIVERTON VALLEY IRRIGATION DISTRICT

Riverton Valley ID. Preliminary Investigation Report, March, 1968.

Boyle Corporation. Riverton Valley Irrigation District Project Status Report and Cost Estimate, December 16, 1982.

___. Contract Documents for Construction of Wyoming Canal No. 2, Rehabilitation, May, 1984.

___. Level III Development Plan, Rehabilitation of Wyoming No. 2 Canal, Economic Analysis, May, 1984.

___. Engineering Design Report for the Level III Development Plan for Rehabilitation of the Wyoming No. 2 Canal, May, 1984.

Chen & Associates. Subsoil Investigation for the Proposed Rehabilitation of the Riverton Valley Irrigation District Canal, Fremont County, Wyoming, June, 1984.

SHELL VALLEY

U.S. Department of Agriculture, Wyoming SEO. Wyoming Cooperative Irrigation Water Conservation Report, Shell Canal System, January, 1982.

Morrison-Maierle, Inc. Specifications for Well Drilling, Shell Valley Deep Well Project Part II, November, 1984.

HKM Associates. Shell Valley Watershed Level II Study, Final Report, January, 1985.

ESA Geotechnical Consultants. Shell Valley Watershed, Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement, January, 1986.

___. Shell Valley Watershed, Level III, Executive Summary, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement, January, 1986.

Morrison-Maierle, Inc. Final Report, Shell Valley Deep Well Project with Results of Aquifer Tests for Shell Valley Watershed Supply Project, February, 1986.

ESA Geotechnical Consultants. Executive Summary, Phase II: Lake Adelaide Enlargement, Shell Valley Watershed, Level III, December, 1986.

Simons & Associates, Inc. Channel Dynamics Analysis of Buckley Creek, March, 1987.

Crank Companies, Inc. Executive Summary, Shell Valley Domestic Water Supply Project, Level III, no date.

SHOSHONE MUNICIPAL

Engineering Associates. Municipal Water Development Association, Preliminary Feasibility Study for Water Transmission Pipeline, January 4, 1982.

___. Feasibility Study, Shoshone Municipal Pipeline Project, January, 1983.

___. Executive Summary, Feasibility Study, Shoshone Municipal Pipeline Project, no date.

James M. Montgomery. Project Status Report, Shoshone/Lakeview Water Development Project, August, 1984.

___. Shoshone Municipal Water Supply Project-Level II Investigation Report, January, 1986.

Banner Associates, Inc. Operating Plan for the Shoshone Municipal Water Supply Project, October, 1986.

___. Level III Interim Report, Executive Summary, Shoshone Municipal Water Supply Project, December, 1986.

___. Level III Interim Report, Shoshone Municipal Water Supply Pipelines, December, 1986.

SHOSHONI, TOWN OF

Civil Engineering Professionals, Inc. Executive Summary, Level II Feasibility Study, Shoshoni Water Supply System Rehabilitation Project, January, 1991.

___. Final Report, Level II Feasibility Study, Shoshoni Water Supply System Rehabilitation Project, January, 1991.

SIDON CANAL

Inberg-Miller Engineers. Interim Report for Marchant Wash Crossing, Sidon Canal Rehabilitation Project, Level II, October, 1993.

___. Sidon Canal Rehabilitation Project, Level II Project Report, Executive Summary, September, 1994.

___. Sidon Canal Rehabilitation Project, Level II Project Report, September, 1994.

___. Sidon Canal Rehabilitation Project, Level II Project Report, Executive Summary, September, 1994.

UPPER BLUFF

Donnell & Associates, Inc. Executive Summary, Upper Bluff Rehabilitation Project, Level II, Feasibility Study, November 4, 1988.

___. Final Report, Upper Bluff Rehabilitation Project, Level II Feasibility Study, November 4, 1988.

U.S. Bureau of Reclamation. Report on Proposed Rehabilitation and Betterment Program, Upper Bluff Irrigation District, Hanover Bluff Unit, Pick-Sloan Missouri Basin Program, August 28, 1989.

UPPER HANOVER

Nelson Engineering. Executive Summary Design Report, Upper Hanover Rehabilitation Project, Level II, November, 1990.

___. Final Design Report, Upper Hanover Rehabilitation Project, Level II, November, 1990.

UPPER LITTLE WARM SPRINGS WATER SUPPLY

Jorgensen Engineering. Final Level II Study Report, Upper Little Warm Springs Water Supply Project, November 30, 1993.

___. Executive Summary, Level II Study Report, Upper Little Warm Springs Water Supply Project, November 30, 1993.

___. Final Level II, Phase III Study Report, Upper Little Warm Springs Water Supply Project, November, 1995.

WASHAKIE RURAL

Engineering Associates. Washakie Rural Water Supply Project, Level I Study - Final Report, October, 1995.

___. Washakie Rural Water Supply Project, Level I Study - Final Report, Executive Summary, October, 1995.

BRS, Inc. Washakie Rural Water Supply Project, Level II - Executive Summary, November, 1998.

___. Washakie Rural Water Supply Project, Level II - Final Report, November, 1998.

WESTSIDE IRRIGATION PROJECT

Engineering Associates. Westside Irrigation Project Study, March, 1978.

U.S. Bureau of Reclamation. Westside Irrigation Project, (Wyoming), Special Report, September, 1983.

HNTB. Westside Irrigation Project, July, 1984.

Nelson Engineering, Inc. Westside Project, Plan Formulation Working Document, Final Report, June 30, 1985.

Synopsis of the Westside Irrigation Project. August 19, 1988.

U.S. Bureau of Reclamation. Westside Irrigation Project, Planning Report, Draft Environmental Statement, September, 1988.

WILLWOOD DAM

Stone and Webster. Willwood Hydroelectric Project, Report on Feasibility Study, October, 1982.

Engineering Associates. Willwood Dam Rehabilitation Project, Rehabilitation Plan, August 30, 1989.

___. Willwood Dam Rehabilitation Project, Final Report, November, 1, 1989.

___. Willwood Dam Rehabilitation Project, Final Report Executive Summary, November 1, 1989. 2 copies.

WIND RIVER BASIN

Bishop and Spurlock, Consulting Engineers. Report on Water Resources in the Wind River Basin, Summer, 1962.

U.S. Bureau of Reclamation. Report on Wind Division, Wyoming, Missouri River Basin Project, October, 1966.

___. Wind River Basin Water Supply Study, Wyoming, 1981.

Leonard Rice Consulting Water Engineers, Inc. Wind River, Blue Holes Reservoir, Hydrology and Water Rights Study, March, 1984. 3 copies.

Packet of Maps, Blue Holes Dam Site Topography.

Nelson Engineering. Final Report, Wind River Study, LeClair Canal Rehabilitation, Level I - Phase I, January, 1992.

___. Final Report, Wind River Study Riverton Valley Rehabilitation, Level I - Phase I, January, 1992.

___. Final Report, Wind River Study, LeClair Canal and Riverton Valley, (Wyoming No. 2 Canal) Rehabilitation, Level I, Phase III, March, 1993.

___. Wind River Study, LeClair Canal and Riverton Valley, (Wyoming No. 2 Canal) Rehabilitation, Level I, Phase III Executive Summary, March, 1993.

___. Wind River Study, LeClair Canal and Riverton Valley, (Wyoming No. 2 Canal) Rehabilitation, Level I, Phase III Final Report, March, 1993.

Natural Resources Consulting Engineers, Inc. Summary of the Wind River Basin Water Management Studies, October, 1994.

Wyoming Water Development Commission. Wind River Water Supply Project, March, 1996.

WORLAND, CITY OF

Forsgren Associates, Inc. Worland Pipeline Project, Level II Feasibility Study, December, 1997.

YELLOWSTONE BASIN

Missouri River Basin Commission. Report on the Yellowstone Basin and Adjacent Coal Area, Level B Study, Wind-Bighorn-Clarks Fork, April, 1978.


Wind/Bighorn River Basin Reference Notebook Table of Contents
Wyoming State Water Plan Homepage | Search the State Water Plan Website