Wyoming State Water Plan, Wyoming Water Development Office
Rafting on Snake River Lake Marie, Snowy Mountains Wyoming Wind River Range picture

Green River Basin Water Plan
Final Report

V       Future Water Use Opportunities

As with all chapters in this final plan report, explicit lists of references are not provided. Instead, all references to report, documents, maps, and personal communications are maintained in the Technical Memoranda that were prepared during the current planning process. Should the reader desire to review a complete list of references for the information presented in this chapter, the following memoranda should be consulted:

A. Review of Previous Planning Studies

Over the years many planning studies have been undertaken for Wyoming's Green River Basin. A summary outline of those most dedicated to additional development of water resources includes:

For the current planning effort, these documents were reviewed to determine the extent to which previously identified projects could contribute to meeting current needs. While not an all-inclusive list of planning efforts in the Basin, the above documents were found most valuable in summarizing the extent and history of projects, storage sites, and other features suitable for analysis against newly minted demands.

B. Review of Future Basin Demands

To guide the process of evaluating projects to meet future needs and develop water under Wyoming's Compact entitlements, it was important to compare projected demands (and locations of those demands) to estimated water availability. In this process, several facts became clear. To summarize, the following study results lent direction to determination of future water use opportunities:

Considering consumptive uses, only agriculture currently sees shortages to existing needs. Predictably, these shortages are in areas not already served by storage to any significant extent. Unfortunately, the main reason these shortages exist is that agriculture is the economic sector least able to afford the high cost of storage construction, especially those operators focused upon raising forage instead of cash crops, to provide late season supplemental supplies. A situation is created where shortages are faced by users who cannot by themselves shoulder the entire financial burden of the work that would solve their problem, even when current funding programs can assist with large portions of the capital costs covered by grants.

Considering non-consumptive uses, such as recreational and some environmental applications (e.g. instream flows), funding is also a concern. In recent years, mitigation associated with reservoir construction has been used to replace or enhance environmental values with funding provided by others. There also exists the notion that environmental and recreational needs are not always compatible with storage. Where stream access for fishing is in short supply, the inundation of stream habitat by storage only exacerbates the problem. Where instream flows are desirable, the hydrology of the natural stream system still cannot put water in the river in a dry year unless those flows are tied to storage. Compounding the conflict, where run-of-the-river hydrology is favorable for aquatic and riparian habitats (and recreation pursuits), the reservation of flows for this purpose, while valuable, may preclude the use of this water for other consumptive needs allowed under the governing compacts. In fact, Wyoming's Instream Flow law requires that instream flow use "shall not result in more water leaving the State than the amount of water that is allocated by interstate compact or United States Supreme Court Decree for downstream uses outside of Wyoming."

Therefore, the general direction taken for recommending future use opportunities focused largely on providing supplemental irrigation supplies. However, the effects of the various projects on environmental and recreational values are very important and can result in otherwise similar projects being viewed quite differently. Where multiple uses are available, these are also investigated.

C. Compact Considerations

One possibility for the ultimate disposition of water under the compacts is the sale or lease of water to downstream out-of-state interests. This is an unpopular result largely because of the perceived irreversibility of the process. Once sold or leased, such water may never be retrievable for Wyoming should future demands need it. Additionally, under current state law, the sale of water outside the State is disallowed without legislative action. Any move in this direction would therefore require state legislature approval and would also have to be approved by the Upper Colorado River Commission (the coalition of upper basin states established by the Upper Colorado River Basin Compact).

In large part, the concept of sale or lease of Wyoming's unused share of Compact- allocated water is an understandable expression of the feeling that if not used or planned to be used, Wyoming may somehow lose its undeveloped water to thirsty downstream states. The compacts wisely anticipated such a situation, and the Law of the River includes language protecting Wyoming's future uses:

There exists additional language in the junior Compact that protects states' rights to develop allocated water in accordance with any particular state's power of regulation, in effect allowing out-of-basin (but in-state) transfers of water:

Because both compacts contain language that preclude their termination without the consent of all signatory states, Wyoming alone can keep the above language in force as long as it remains in the State's best interest.

D. Long List of Water Supply Opportunities

From the planning studies previously listed, and from newer potential project ideas provided by Basin Advisory Group (BAG) members, over 80 projects were reviewed for potential application to current and future needs. Items such as groundwater use and conservation are not evaluated in the long list but do show up in the short list to follow.

Screening of the initial list resulted in the removal of certain projects from further consideration. Examples of these include most projects that exist on what now are dedicated Wilderness lands. While Wilderness boundaries have been known to be moved to allow project construction, such an action is singularly rare and in most cases creates a fatal flaw for that feature. The one project involving Wilderness boundary issues that made it past the initial cut was the BAG-suggested project involving the enlargement of Green River Lakes. This project was kept alive in the process for several reasons, notwithstanding the fact that the Wilderness issue could render it unbuildable: first, its location could serve many users currently experiencing agricultural shortages; second, review of earlier studies did not indicate that it had been studied in depth as yet; and finally, while there are obvious environmental impacts associated with construction of the project, the benefits associated with augmented late season flows have not been evaluated.

Another example of a previous project that did not pass initial muster is the oft-discussed Sandstone Dam in the Little Snake River Basin. The subject of considerable study in the 1980s, this project has been effectively replaced with the imminent construction of High Savery Dam in the same drainage.

From the long list, projects of minimal size were also deleted. Generally, if a project stored or depleted 1000 acre-feet or less, it was not considered further. This decision is not intended to reflect on the importance of small projects or to diminish their need. Instead, it is simply a matter of keeping the planning process from becoming unwieldy having to consider a multitude of smaller projects. If previous studies indicated a project to be uneconomical or undesirable, this also served as impetus to delete the project from short list consideration. Projects appearing in very early studies that no longer are attractive due to location, benefits, or because other nearby sites have garnered recent favorability have also been deleted.

The long list is shown in Table V-1. A map showing the locations of these features is given as Figure V-1. Because the forecasted need for agricultural water (Chapter IV) describes a maximum of 50,000 acre-feet of storage development, no grand schemes involving multiple reservoirs are put forth. Instead, individual projects are evaluated on their own merits, and combinations thereof can be evaluated in further level I or level II studies at the pleasure of project sponsors. Where projects have been evaluated in combination by previous authors, such combinations are described in the technical memorandum on screening criteria.

Potential Reservoir Sites
click to enlarge

Table V-1 Long List of Potential Reservoir Sites
PID** NAME SIZE (AF) SOURCE SECTION TOWNSHIP RANGE USE
1 Fish Creek 1,400 Fish Creek 26 30 115 irr
2 Fontenelle No. 1 2,500 Fontenelle Creek 4 24 115 irr
3 Fontenelle Creek 15,950 Fontenelle Creek 30 26 115 irr
4 Green River Lakes Enl. 250,000 Green River 2 39 109 irr, pow
5 Green River Supplemental Supply Project Canal Enlargement OnlyGreen River 4 33110 irr
6 Kendall 100,000 Green River 33 36 111 ind, mun, irr
7 LaBarge Meadows 4,800 LaBarge Creek 8 29 116 irr
8 Lower Green Reservoir 450,000 Green River 25 19 108 irr
9 Lower Kendall 100,000 Green River 4 35 111 irr, rec, wl, pow
10 McNinch Wash 5,600 North Piney Creek 10 30 113 irr
11 Middle Piney Lake 4,200 Middle Piney Creek 8 30 115 irr
12 North Piney Cr 5,600 North Piney Creek 24 31 115 irr
13 Plains Reservoir 480,000 Green River 8 23 109 irr, ind, mun, wl
14 Sand Hill 14,100 Middle Piney Creek 36 30 113 irr
15 Seedskadee Project 57,000 ac Green River
23 111 irr
16 Sixty-Seven Enl. 5,600 North Piney Creek 17 30 112 irr
17 Snider Basin 4,300 South Piney Creek 11 29 115 irr
18 South Cottonwood 6,000 Cottonwood Creek 12 32 115 irr
19 Warren Bridge Res 33,400 Green River 4 35 111 irr
20 Cottonwood No.1* 1,465 S Cottonwood Cr 16 32 115 irr
21 Fogarty Creek* 700 Dry Piney Creek 24 28 114 irr
22 Horse Creek* 36,660 Horse Creek 7 34 114 irr
23 LaBarge Reservoir* 4,030 LaBarge Creek 12 29 116 irr
24 Middle Beaver Creek* 5,905 Middle Beaver Creek 29 36 112 irr
25 North Cottonwood Creek* 10,805 North Cottonwood Creek 24 33 115 irr
26 South Beaver Creek* 5,905 South Beaver Creek 24 35 114 irr
27 South Cottonwood Creek* 10,805 South Cottonwood Creek 11 32 115 irr
28 South Horse Creek* 36,660 South Horse Creek 30 34 114 irr
29 Straight Creek* 4,815 Straight Creek 4 30 115 irr
30 East Fork 2,100 East Fork River 10 31 106 irr
31 East Fork #1 4,735 East Fork River 4 31 105 irr
32 East Fork Gorge unknown East Fork River 12 31 106 irr
33 East Side Project 22,000 ac East Fork River
30 106 irr
34 Burnt Lake 15,570 Fall Creek 31 34 107 irr
35 Halfmoon Enl. 95,000 Pole Creek 15 34 108 irr, pow
36 New Fork Narrows 100,000 New Fork River 14 30 110 irr, wl, rec
37 Silver Creek 17,740 Silver Creek 11 32 107 irr
38 Dad's Lake* 740 Dad's Creek 18 32 104 irr
39 East Fork River* 46,070 East Fork River 7 31 105 irr
40 Feltner* 1,280 Pole Creek 12 34 108 irr
41 Mack No. 1* 766 Skeleton Draw 5 30 108 irr
42 Marm's Lake* 562 Dad's Creek 7 32 104 irr
43 New Fork Lake Enl.* 45,937 New Fork River 15 36 110 irr, pow
44 Pyramid* 636 Pyramid Creek 17 33 104 irr
45 Eden No. 2 (Sander's Ranch) 60,000 Big Sandy Creek 17 30 104 irr, ind
46 Eden Reservoir Rehabilitation 6,300 Little Sandy River 17 26 105 irr
47 Eden Valley Improvements 3,100 ac East Fork/Big Sandy
25 106 irr
48 Meeks Cabin Dam Enl. unknown Blacks Fork 11 12 117 irr
49 Stateline Enl. unknown E Smiths Fork Cr Utah irr
50 BB* 650 Blacks Fork 18 18 112 irr
51 Deer Lake* 1,000 E Smiths Fork Cr 29 13 115 irr
52 Hams Fork* 215,475 Hams Fork 12 21 116 irr, mun, ind
53 McWinn* 800 Hertley Hollow Cr 16 22 117 irr
54 Uinta Canal No. 3* 16,790 Uinta Can. Blacks Fk 34 17 114 irr
55 Big Gulch 10,000 Big Gulch 19 13 88 irr
56 Dutch Joe Creek 14,000 Dutch Joe Creek 35 13 90 irr
57 Grieve Res. 4,860 Grieve Res. 5 12 88 irr
58 Lower Willow Creek, WY 7,000 Lower Willow Creek, WY 8 12 90 irr
59 Pot Hook, CO 20,000 Pot Hook, CO Colorado irr
60 Upper Willow Creek, CO 10,000 Upper Willow Creek, CO Colorado irr
61 Cottonwood Creek* 2,500 Cottonwood Creek 34 13 90 irr
62 East Willow* 12,000 East Willow, CO Colorado irr
63 Loco Creek* 3,000 Loco Creek 34 14 89 irr
64 Lower Battle Creek* 20,000 Lower Battle Creek 13 12 88 irr
65 Middle Battle Creek* 20,000 Middle Battle Creek 7 12 87 irr
66 Muddy Creek* 12,000 Muddy Creek 9 13 91 irr
67 Negro Creek* 1,000 Negro Creek 16 13 89 irr
68 Old Upper Savery Cr* 20,000 Old Upper Savery Cr 36 15 89 irr
69 Roaring Fork* 5,000 Roaring Fork 28 13 86 irr
70 Sandstone* 20,000 Sandstone 2 13 89 irr
71 South Fork Little Snake* 17,000 South Fork Little Snake, CO Colorado irr
72 Upper Battle Creek* 20,000 Upper Battle Creek 20 13 87 irr
73 Upper Slater* 20,000 Upper Slater, CO Colorado irr
74 Big Basin Antelope* 107,680 Henrys Fork Utah irr
75 Vermilion/Red Creek Basin unknown Vermilion/Red Creek 19 13 101 irr
* Project deleted from short list consideration
* PID = point identification number on Figure V-1

E. Criteria for Ranking Future Water Use Opportunities

Based upon comments received during Basin Advisory Group (BAG) meetings, review of previously published criteria and questionnaire results, and the Scope of Services, the following procedure for screening opportunities for future water use was developed:

Six criteria will be evaluated under each of these priorities to present an overall picture of the favorability of a project or opportunity. These criteria, and the method by which they will be applied, are:

1 Water Availability

This criteria reflects the general ability of a project to function, given likely bypasses for environmental uses and prior rights. It is not a reflection of the relative size of the project.


2 Financial Feasibility

This criteria reflects the effects of the combination of technical feasibility (high or low construction cost) and economic use to which the water would be put (e.g. irrigation of native meadow vs. cultivation of alfalfa or row crops). The intent of this ranking is to indicate the likely ability to afford the project or meet Wyoming Water Development Commission (or other) funding source criteria. A low number represents a project with suspect ability to be repaid, whereas a high number represents a project that should more easily meet funding and repayment requirements.


3 Public Acceptance

This criteria reflects the extent to which a project will encounter or create public controversy (low number) versus a project that would likely engender broad public support (high number). For example, on-stream storage in environmentally sensitive areas would be very controversial, while off-channel storage in less sensitive areas would more likely be supported.


4 Number of sponsors/beneficiaries/participants

This criteria reflects the desirability, all other things being equal, that a project serving a larger segment of the population should rank higher (higher number) than one serving only a few (lower number).


5 Legal/Institutional concerns

This criteria reflects the perceived relative ease (high number) or difficulty (low number) with which a project could be authorized and permitted under existing state and federal law.


6 Environmental/Recreation benefits

This criteria reflects the net effect of positive environmental and recreational aspects of a project as offset, to the extent it can be determined, by potential negative impacts on these attributes.

F. Short List of Water Supply Opportunities

The planning project technical memorandum Criteria For Screening Future Water Use Opportunities contains descriptions of all projects considered in the first cut. Applying the criteria described above to those that remained resulted in the matrix shown on Table V-2. The projects listed in Table V-2 are the short list of water supply opportunities. Because many projects have different types of information available and many were studied in varying depth of detail, the process of ranking using these criteria was admittedly subjective. In many cases, the number of beneficiaries or the precise recreational and environmental benefits could not be known with certainty absent further study. As much as possible, ranking was performed based on experience with other recent projects, knowledge of basin conditions, and with the input of BAG members.

Some discussion of the scoring system used in Table V-2 is warranted. First, the scores in and of themselves are meaningless other than to place the projects in some relative order. The resulting ranking, with higher scores placing projects higher within their respective priorities, represents the relative likelihood that a project is desirable, functional and could receive enough public support to be constructed. Projects with similar "scores" but under different priorities should not be considered equally desirable or equally likely, because the weighting factors for each criteria differ depending on the priority. Potential projects are grouped by sub-basin so that plan readers can review the studied projects by geographic locale.

Conservation Opportunities

Improved irrigation practices, such as conversion from flood irrigation to sprinkler irrigation, is one means of improving the efficiency of water usage. Conveyance losses are another major factor contributing to inefficiency in agricultural use. Many ditches and canals in the Basin experience higher than normal conveyance losses, generally due to porous soils. Lining the canal with concrete or other material can greatly reduce the amount of flow lost to the surrounding soils.

Losses of 10 percent in irrigation ditches and canals are considered normal, or typical. Ditches and canals in sandy, cobbled, or alluvial soils, or fractured rock, where losses exceed 10 percent are potential candidates for rehabilitation. There are a number of canals in the Basin that exceed even 20 percent losses (see technical memorandum Water Conservation). These fall under the category of "Miscellaneous Canal Rehabilitation" in the short list of water supply opportunities.

Table V-2 Criteria Matrix
Priority Type PID Est. Yield(y), Cap(c) or Depl(d) (AF) Water Availability Financial Feasibility Public Acceptance No. of Sponsors / Beneficiaries Legal / Institutional Environmental / Recreation Benefits Score*
**
Priority 1*

3 9 3 9 5 5
Eden Reservoir Rehabilitation** 46 6,300 c 6 9 9 8 8 2 248
Misc. Canal Rehab (Conservation)
unk 9 7 8 6 6 2 208
Middle Piney Reservoir 11 4,201 c 8 5 5 5 3 4 164
Sixty Seven Enlargement (off ch) 16 5,600 c 5 5 6 4 6 2 154
Grieve Reservoir 57 4,860 y 4 4 6 4 6 4 152

Priority 2

8 5 8 6 10 3
      Upper Green River
Green River Supplemental Supply 5 22,000 d 7 6 6 8 5 2 238
Sand Hill (off ch) 14 14,100 c 5 6 7 6 6 3 231
Fontenelle Creek Narrows 2 2,500 c 6 5 6 4 6 5 220
McNinch Wash (off ch) 10 5,600 c 5 5 7 4 6 3 214
Snider Basin 17 4,300 c 6 6 5 5 5 5 213
South Cottonwood 18 6,000 c 6 5 5 5 5 5 208
Groundwater Development
unk 2 2 9 2 9 2 206
North Piney Creek 12 5,600 c 6 2 5 5 5 5 193
LaBarge Meadows 7 4,800 c 5 3 5 4 5 5 184
Warren Bridge 19 33,400 c 8 5 2 8 1 4 175
Fish Creek 1 1,400 c 3 5 5 2 5 4 163
Green River Lakes Enl. 4 <250,000 c 9 5 0 9 0 2 157
      New Fork River
East Fork 30 2,100 c 7 5 5 5 5 5 216
East Fork Gorge 32 unk 7 5 5 5 5 5 216
Boulder Lake Enl.
<120,000 c 8 7 4 6 3 5 212
Groundwater Development
unk 2 2 9 2 9 2 206
Silver/Spring Creeks 37 17,000 c 5 5 5 4 5 5 194
Burnt Lake Enl. 34 15,570 c 8 7 2 5 2 5 180
Halfmoon Enl. 35 <95,000 c 8 7 2 5 2 5 180
East Fork No. 1 31 4,700 c 8 3 2 5 2 5 160
      Big Sandy River
Sander's Ranch (Leckie Ranch) 45 60,000+ c 7 5 5 6 5 5 222
Groundwater Development
unk 2 3 9 2 9 2 211
      Blacks Fork River
Groundwater Development
unk 2 2 9 2 9 2 206
      Little Snake River
Groundwater Development
unk 2 2 9 2 9 2 206
Lower Willow Creek 58 2,700 y 5 5 5 5 4 5 190
Big Gulch 55 5,250 y 3 6 5 4 5 5 183
Upper Willow Creek (CO) 60 1,500 y 4 5 5 4 4 5 176
Pot Hook 59 6,700 y 6 4 4 6 1 5 161
Dutch Joe 56 5,000 y 4 6 5 5 2 3 161
      Vermilion/Red Creek Basins
Groundwater Development
unk 2 2 9 2 9 2 206
Storage Project 75 unk 5 4 7 3 5 4 196

Priority 3

8 5 8 6 10 3
      Green Below Fontenelle
Groundwater Development
unk 2 2 9 2 9 2 206
Eden Project Improvements (USBR) 47 10,000 d 6 5 6 6 2 2 183
Seedskadee Project (USBR)
86,000 d 9 3 4 5 1 2 165
      Upper Green River
Green River Supplemental Supply 5 22,000 d 6 6 6 8 5 2 230
Groundwater Development
unk 2 2 9 2 9 2 206
East Side Project 33 32,000 d 6 5 4 4 3 3 168
Kendall (Upper Kendall) 6 >100,000 c 9 5 1 8 0 4 165
Lower Kendall 9 >100,000 c 9 5 1 8 0 4 165
New Fork Narrows 36 >100,000 c 9 4 1 5 0 4 142
      Blacks Fork / Hams Fork Rivers
Viva Naughton Enlargement
36,000 c 7 5 6 5 5 6 227
Stateline Enlargement 49 unk 6 5 6 7 4 5 218
Meek's Cabin Enlargement 48 unk 5 5 6 7 4 5 210
Groundwater Development
unk 2 2 9 2 9 2 206
      Little Snake River
Groundwater Development
unk 2 2 9 2 9 2 206
Lower Willow Creek 58 2,700 y 5 5 5 5 4 5 190
Upper Willow Creek (CO) 60 1,500 y 4 5 5 4 4 5 176
Dolan Mesa Canal
2,700 d 5 3 5 3 4 4 165
Savery-Pot Hook Project(USBR)
5,000 y 6 4 4 6 1 5 161

Priority 4

3 5 10 6 9 5
      Green Below Fontenelle
Plains Reservoir (off ch) 13 <480,000 c 9 3 3 3 1 4 89
Lower Green Reservoir 8 <450,000 c 9 2 2 2 1 3 73
      Upper Green River
Kendall (Upper Kendall) 6 >100,000 c 9 4 0 7 0 3 104
Lower Kendall 9 >100,000 c 9 3 0 5 0 3 87
New Fork Narrows 36 >100,000 c 9 3 0 5 0 3 87
Notes:
* Each criteria has a different weighting under each priority; 10 is most important, 1 is least important
** Under each project, the criteria are individually ranked; 10 means largely favorable, 0 is unfavorable
*** Scores are the additive result of multiplying each project criteria weighting by the associated priority criteria ranking

    Priorities:
  1. Preserves existing uses and dependencies
  2. Addresses existing shortages
  3. Addresses future projected needs
  4. Addresses future out-of-basin, in-state needs

G. Legal and Institutional Constraints

In recent years, federal and state laws, rules, regulations and policies have affected the business of water development and management. The purpose of this section is to identify some of these institutional constraints to water development and to discuss some steps that a project proponent may take to address those constraints.

Federal Environmental Laws

In the late 1960's and early 1970's, Congress passed legislation to protect the environment. Prior to the passage of these laws, most water projects were designed and operated for specific consumptive uses for municipal, agricultural or industrial purposes. Environmental benefits derived from the projects were largely indirect and incidental to the purposes for which they were designed. With the passage of environmental laws, minimum flow releases became requirements of federal project permits. At the same time, the economic benefits of recreation and reservoir fisheries became more apparent, which resulted in minimum pools becoming a planned component of reservoir operations.

Actions relating to water supplies and development that might be requested of the federal government that initiate or "trigger" the federal environmental laws include, but are not necessarily limited to, the following:

  1. Issuance of special use and right-of-way permits for new water projects on federal lands, including those lands administered by the Bureau of Land Management (BLM), the U.S. Forest Service (USFS), and other federal agencies.

  2. Renewal of special use and right-of-way permits for existing water projects on federal lands, including those lands administered by the BLM, the USFS, and other federal agencies.

  3. Contracting for storage water from federal reservoirs.

  4. Renewal of existing contracts for storage water from federal reservoirs.

  5. Actions that involve the discharge of dredged and/or fill material into waters of the United States, including rivers, streams, and wetlands, require the issuance of a Section 404 permit under the Clean Water Act. (e.g. the construction of dams, diversion dams, pipeline crossings, etc.)

  6. Procurement and renewal of licenses from the Federal Energy Regulatory Commission (FERC) to produce hydropower.

  7. Use of federal funds, loans or grants, to construct a new water project or rehabilitate an existing water project.

The only water development activity that presently falls outside the aegis of federal environmental laws is drilling a well with non-federal funds on non-federal lands outside the banks of rivers, streams, and wetlands. However, piping the water from such wells across federal lands or rivers, streams, and wetlands could initiate a federal environmental review.

Endangered Species Act

The Endangered Species Act of 1973 (ESA) requires the Secretary of Interior, through the U.S. Fish and Wildlife Service (USFWS), to determine whether wildlife and plant species are endangered or threatened based on the best available scientific information. The ESA constrains all federal agencies from taking any action that may jeopardize the continued existence of an endangered or threatened species. If a federal agency is considering an action that may jeopardize an endangered species, Section 7 of the ESA requires that the agency must consult with the USFWS.

National Environmental Policy Act

The National Environmental Policy Act of 1969 (NEPA) requires that federal agencies consider all reasonably foreseeable environmental consequences of their proposed actions. A review of that action under NEPA can be in the form of a simple finding of no significant impact (FONSI), an environmental assessment (EA), or an environmental impact statement (EIS). Further, NEPA requires federal decision makers to "study, develop, and describe appropriate alternatives to recommended courses of action in any proposal which involves unresolved conflicts concerning alternative uses of available resources." (42 USC 4321 et seq., Sec. 102(2)E). NEPA provides federal agencies the opportunity to determine which alternative, including no action, they feel best serves the applicant's purpose and need. The alternative selected by the federal agency may differ from the one preferred by the applicant.

Clean Water Act

Section 404 of the Clean Water Act of 1972 prohibits discharging dredged or fill materials into waters of the United States without a permit from the U.S. Army Corps of Engineers (USCOE). The waters of the United States include rivers and streams and, as of 1993, wetlands. USCOE policy requires applicants for 404 permits to avoid impacts to waters of the U.S. to the extent practicable, then minimize the remaining impacts, and finally, take measures to mitigate unavoidable impacts. In addition to the alternative review required by NEPA, Section 404 (b)(1) guidelines require an alternative review to define the least environmentally damaging practicable alternative.

Summary

The federal government, with the authorizations provided by the Endangered Species Act, the National Environmental Policy Act, and the Clean Water Act, has the tools to ensure the protection of endangered species, critical habitat, and other federal environmental interests.

Federal Lands

Approximately 68 percent of the Green River Basin is federal land. In particular, the Bureau of Land Management (BLM) administers about 58 percent, over 6 percent are national forests, while recreation areas, wilderness areas, and wildlife refuges combined comprise just under 4 percent. Moreover, there are candidate lands for wild and scenic designations. The BLM, the U.S. Forest Service, or others agencies managing the federal lands must assure that the requirements of the above laws are met before they can issue a special use permit authorizing a proposed action on federal lands, such as construction of a water project.

The scrutiny under which the federal laws will be applied is based on the sensitivity of the environment impacted or effected. For example, it may be a rather simple process to obtain a special use permit to construct a small water pipeline across the prairie within BLM jurisdiction. However, it would be virtually impossible to obtain a special use permit to construct a large dam within a wild and scenic river designation.

Project proponents must demonstrate a "purpose and need" for a project in order to obtain federal clearances for major water projects, whether or not the proposed project is located on federal lands. However, if the proposed location of the project is on federal lands, the "purpose and need" of the project proponent may be secondary to goals of the federal agency's management plans. Providing supplemental irrigation water has been recognized as sufficient purpose and need to justify a project.

As previously noted, NEPA provides federal agencies the opportunity to determine which alternative, including no action, they feel best serves the applicant's purpose and need. If the proposed project is located on federal lands and does not comply with the federal agency's management plan, project proponents may be faced with the task of convincing that federal agency that the proposed project at that specific location is the only alternative available to meet the proponent's purpose and need.

Wyoming Environmental Laws

The Section 401 Permit is the state certification of the Section 404 Dredge and Fill Permits required from the U.S. Army Corps of Engineers. A separate permit application is not required since all 404 Permit applications are automatically forwarded to the state in which a the 404 permit is being requested. The Section 401 permit also outlines those additional permits required prior to the initiation of construction activities.

Wyoming Water Law

Wyoming water law is based on the prior appropriation doctrine, or "first in time-first in right". Therefore, in times when there is not enough water to fulfill all the water rights, those water users having an earlier-priority-date water right are allowed to receive their full entitlement before those water users that have a later priority date or "junior" water right may receive any water under their right.

The priority date for a new project is established by the date the project proponent applies for a water right from the Wyoming State Engineer's Office. In order to determine the water supply a new project may achieve, it is important to evaluate the existing water rights that will be "senior" to the new project. Before the decision is made to pursue a project at a particular location, the potential yield of the project should be estimated. The firm yield is the water supply benefits the project proponent could expect under worst case or drought conditions. If the proposed project is located on a stream or river that has several "senior" water rights, a new project may not be able to achieve a water supply in the drier months, such as July and August, or during drought years. Under these conditions, the development of storage facilities would be required to store water when flows are surplus to existing water rights.

Due to the costs involved, water users are naturally interested in a firm supply before they are willing to invest in a water project. In fact, industrial water users are interested in the yield of a potential project under "doomsday" conditions, such as assuming that the worst water year of record occurs in consecutive years. These expectations of water users make the priority date of the water rights of new projects relative to existing water rights a critical factor in assessing the feasibility of new water development projects.

H. Solutions

The following is a list of actions project proponents may take to address the institutional constraints within federal and state laws, rules, regulations and policies.

Project Purpose

Project proponents should have a clear definition of the purpose of their project. There are several purposes for a project: agricultural, municipal, or industrial water use; power generation; flow control; recreation; fisheries and others. In fact, the project proponent may have several purposes in mind. For example, a reservoir could serve all of the above listed purposes. However, the alternatives analyses required by NEPA can become very complex, time consuming and costly for a multipurpose project. Each of the purposes for a proposed project will typically have its own individual alternative analysis.

Project Need

The project proponent must define the need for water to meet the defined purpose or purposes for the project. For example, if the purpose of a proposed agricultural project is to increase the yield of alfalfa or native hay, the amount of water needed for this purpose must be calculated. If the purpose of a proposed municipal project is to meet future water needs, the project proponent must complete population projections and future demand estimates in a manner that withstands the scrutiny of the federal permitting agencies. The needs analyses will have to quantify the amount of water that will be stored or diverted and consumed by the proposed action. Typically, the federal permitting agencies will require that future water conservation activities be considered in the needs analysis.

Alternative Analyses

Project proponents should have evaluated several alternatives prior to selecting the alternative that is going to be subjected to the federal review process. As previously noted, NEPA regulations require that the "no action" alternative be considered; all reasonable alternatives should be considered; and the reasons for eliminating potential alternatives must be provided. Therefore, project proponents should develop sufficient information for alternatives to evaluate how well the preferred alternative will fare under the federal review. The federal agencies will typically require that water conservation must be considered as an alternative to the project.

Selection of the Preferred Alternative

Cost and technical feasibility are the primary factors considered by project proponents in determining project feasibility. While these factors are also considered by federal permitting agencies, the federal perspective is more interested in the environmental damage that may occur if the project is constructed and implemented. Therefore, project proponents should consider potential environmental impacts in developing project alternatives.

Federal Lands

If possible, project proponents should avoid locating their project on national forests. It is virtually impossible to locate new water projects within wilderness areas, wildlife refuges, and wild and scenic designations.

Wyoming Water Development Program

Planning, constructing, and operating a water project is costly. Adding the costs to acquire state and federal permits can be overwhelming for public entities in Wyoming. In 1975, in recognition that water development was becoming more difficult and additional water development was necessary to meet the goals and objectives of the State, the Wyoming Legislature authorized the Wyoming Water Development Program and defined the program in W.S. 41-2-112(a), which states:

"The Wyoming water development program is established to foster, promote, and encourage the optimal development of the State's human, industrial, mineral, agricultural, water and recreation resources. The program shall provide through the commission, procedures and policies for the planning, selection, financing, construction, acquisition and operation of projects and facilities for the conservation, storage, distribution and use of water, necessary in the public interest to develop and preserve Wyoming's water and related land resources. The program shall encourage development of water facilities for irrigation, for reduction of flood damage, for abatement of pollution, for preservation and development of fish and wildlife resources [and] for protection and improvement of public lands and shall help make available the water of this State for all beneficial uses, including but not limited to municipal, domestic, agricultural, industrial, instream flows, hydroelectric power and recreational purposes, conservation of land resources and protection of the health, safety and general welfare of the people of the State of Wyoming."

The Wyoming Water Development Commission can invest in water projects as state investments or can provide loans and grants to public entities (municipalities, irrigation districts and special districts) for the construction of projects specific to their water needs. The WWDC has adopted operating criteria to serve as "a general framework for the development of program/project recommendations and generation of information." Individuals and project entities interested in the development of specific water projects should seek information regarding the Wyoming Water Development Program and the possibility of obtaining financial and technical assistance for the development of those projects.

Upper Colorado River Recovery Implementation Program

The State of Wyoming has historically been proactive in dealing with institutional constraints that may impact its ability to develop its water resources as allocated by court decrees and interstate compacts. State representatives review proposed federal mandates ranging from new federal environmental legislation to forest management plans to interject the State's position on these matters and provide for a state perspective in their development and implementation.

One example deals directly with water development in the Green River Basin and the institutional constraints contained in the Endangered Species Act (ESA). In 1988, the States of Wyoming, Utah, and Colorado; the Department of the Interior; and the Western Area Power Administration executed a cooperative agreement to recover four endangered fish species in the Upper Colorado River Basin, while allowing water development to continue. Wyoming's participation in this Upper Colorado River Recovery Implementation Program has facilitated the process by which Wyoming water projects obtain federal clearances under ESA. Rather than spending thousands of dollars on evaluations of potential impacts to the fish species and developing expensive mitigation plans, a project proponent may be able to pay a one-time charge for new depletions which is paid into a fund to benefit the endangered fish. The one-time charge is approximately $14 per acre-foot of depletions, adjusted annually for inflation.