Match: Format:
 
  News   Pilot Products   Basin Plans   Contact Us   Home       

BIBLIOGRAPHY
WYOMING WATER DEVELOPMENT OFFICE
WATER DEVELOPMENT PROGRAM PROJECT REPORTS

ALADDIN

Soda Butte Services, Inc. Executive Summary, Aladdin Water Supply Project, Level I, stamped October 31, 1994.

Soda Butte Services, Inc. Final Report, Aladdin Water Supply Project, Level I, stamped October 31, 1994.

Soda Butte Services, Inc. Well Construction, Testing and Conceptual Design for the Aladdin Water Supply Project, Level II, Executive Summary, October 1995.

Soda Butte Services, Inc. Well Construction, Testing and Conceptual Design for the Aladdin Water Supply Project, Level II, Final Report, October 1995.

BEAVER CREEK

Bearlodge Ltd., Inc. Beaver Creek Dam and Reservoir, Level I, October 30, 1989.

Bearlodge Ltd, Inc. Beaver Creek Dam and Reservoir Project, Level II, Phase 1 Investigation, August, 1990.

Bearlodge, Ltd, Inc. Beaver Creek Dam and Reservoir Project, Final Report, August 28, 1991.

Bearlodge, Ltd, Inc. Beaver Creek Dam and Reservoir Project, Executive Summary, August 28, 1991.

COAL CREEK PROJECT

Atlantic Richfield Company. Alluvial Valley Floor Assessment Coal Creek Project, June 1978.

Atlantic Richfield Company. Report Alluvial Floor Assessment Coal Creek Project, June 1978.

COOK ROAD WATER DISTRICT

HKM Associates. Final Report for a Proposed Water Supply System for Cook Road Water District, Campbell County, Wyoming, October 30, 1992.

Soda Butte Services, Inc. Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project, Level II, Executive Summary, stamped January 24, 1994.

Soda Butte Services, Inc. Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project, Level II, Final Report, stamped January 24, 1994.

CRESTVIEW/ANTELOPE VALLEY WATER SUPPLY

Wester-Wetstein and Associates, Inc. Crestview/Antelope Valley Water Supply Project, Level II, Executive Summary, November, 1999.

Wester-Wetstein. Crestview/Antelope Valley Water Supply Project, Level II, Final Report, October, 1999.

CROOK COUNTY

Chen & Associates. Reconnaissance Geologic And Geotechnical Investigation Driskill No. 1 Reservoir Creek, Section 16 T 53N., R 65W., Crook County, August 31, 1987.

ESA Consultants, Inc. Executive Summary, Crook County Reservoir Project - Level I, July, 1999.

ESA Consultants, Inc. Final Report, Crook County Reservoir Project - Level I, July, 1999.

GILLETTE

State Engineer's Office. Underground Water Supply in the Madison Limestone, Northeastern Wyoming (Powder River Basin), Prepared for the Wyoming State Legislature, December, 1974. 2 copies.

State Engineer's Office. Report on the Gillette Project - A System of Water Wells in the Madison Formation and Pipeline Transmission to the Gillette Area , Governor's Interdepartmental Water Conference, December, 1977. 2 copies.

James M. Montgomery. Madison Well Field, Well M-3 Enhance- ment, May, 1992.

HKM Associates. Phase I Interim Report for Gillette Area Master Plan, Gillette, Wyoming, May, 1993.

HKM Associates. Phase II Final Report Gillette Area Water Master Plan. WWDC, 1994.

Wester-Wetstein & Associates, Inc. Gillette Well Rehabilitation Study, Level II, October, 1994.

Wyoming State Engineer's Office. Fort Union Formation Aquifer Monitoring Plan and Preliminary Aquifer Management Plan, November, 1995.

Stetson Engineering. Executive Summary, City of Gillette Water System Evaluation, October, 1999.

Stetson Engineering. Report, City of Gillette Water System Evaluation , October, 1999.

HULETT

Bearlodge Ltd., Inc. Hulett Water Supply Level II, Final Report, Volume 1, December 5, 1991.

Bearlodge Ltd., Inc. Hulett Water Supply Level II, Final Report, Volume 2, December 5, 1991.

Bearlodge Ltd., Inc. Hulett Water Supply Level II, Executive Summary, December 5, 1991.

LANCE CREEK

Western Water Consultants, INC. Lance Creek Water Supply Master Plan Level I Executive Summary. November 1, 1996.

Western Water Consultants, INC. Lance Creek Water Supply Master Plan Level I Main Report. November 5, 1991.

TOWN OF LUSK

Worthington, Lenhart and Carpenter, Inc. Executive Summary of Level I Master Plan Study of Town of Lusk's Water Supply System, December, 1994.

Worthington, Lenhart and Carpenter, Inc. Town of Lusk Water Project, Level I - Master Plan Study, Final Report, December, 1994.

MK Centennial. Level II - Lusk Water Supply Project, Lusk, Wyoming, Executive Summary, November, 1995.

MK Centennial. Level II - Lusk Water Supply Project, Lusk, Wyoming, Final Report, November, 1995.

MANVILLE

Western Water Consultants, Inc. Manville Water Supply Project, Level II Volume I, June 1997.

Western Water Consultants, Inc. Manville Water Supply Project, Level II Volume II, June 1997.

Western Water Consultants, Inc. Manville Water Supply Project, Level II Executive Summary, June 1997.

Western Water Consultants, Inc. Volume II - Appendices the Manville Water Supply Project Level II, June 1997.

MOORCROFT WATER SUPPLY

Weston Engineering. Executive Summary, Moorcroft Water Study, Level I, October, 1991.

Weston Engineering. Moorcroft Water Study, Level I, April, 1992.

Bearlodge Ltd. Inc. Moorcroft Water Supply Level II, Executive Summary, January 1994.

Stetson Engineering. Executive Summary, City of Gillette Water System Evaluation, October, 1999.

Stetson Engineering. Report, City of Gillette Water System Evaluation, October 1999.

Stetson Engineering. Moorcroft Water Supply Level II, Final Report, January 1994.

NEWCASTLE

Wester-Wetstein & Associates, Inc. Newcastle Area Water Supply Master Plan - Level II, Volumes 1 and 2, April, 2000.

NORTHEASTERN WYOMING (THE POWDER RIVER BASIN)

Wyoming State Engineer's Office. Investigation of Recharge to Groundwater Reservoirs of Northeastern Wyoming (The Powder River Basin) Report, June, 1976.

Wyoming State Engineer's Office. Investigation of Recharge to Groundwater Reservoirs of Northeastern Wyoming (The Powder River Basin) Map Pocket, June, 1976.

Wyoming Water Development Commission. Northeast Wyoming Level I Final Report, September, 1985.

Wyoming Water Development Commission. Northeast Wyoming Level I Final Report, Appendix A, Groundwater Rights Tabulation, September, 1985.

OSAGE WATER SUPPLY

Banner Associates, Inc. Final Report, Osage Water Supply Project, Level II, January, 1994.

Banner Associates, Inc. Final Report, Executive Summary, Osage Water Supply Project, Level II, January, 1994.

Banner Associates, Inc. Executive Summary, Osage Water Supply Project, Level II Extension, April, 1996.

Banner Associates. Final Report, Osage Water Supply Project, level II Extension, April, 1996.

PINE BUTTE IMPROVEMENT AND SERVICE DISTRICT

Centennial Engineering & Research, Inc. Level I Reconnais- sance Information, Pine Butte Improvement and Service Dis- trict, Gillette, Wyoming, December, 1991.

HKM Associates. Final Report for a Proposed Water Supply System for Pine Butte Improvement and Service District , October, 1992.

Wester-Wetstein & Associates, Inc. Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well, Executive Summary for the Pine Butte Water Supply Project, Level II, December 1993.

Wester-Wetstein & Associates, Inc. Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well, Pine Butte Water Supply Project, Level II, December 1993.

SALT CREEK

RCH and Associates. Executive Summary, Level I Water Supply Project, Salt Creek Water District, Newcastle, Wyoming. December, 1996.

RCH and Associates. Final Report, Level I Water Supply Project, Salt Creek Water District, Newcastle, Wyoming. December, 1996.

STATE WATER PLANNING PROCESS

Boyle Engineering Corporation. State Water Planning Process Feasibility Report, October, 1998.

Boyle Engineering Corporation. Executive Summary, State Water Planning Process Feasibility Report, October, 1998.

STOCKADE BEAVER CREEK RESERVOIR

Draft Copy Project Report, Stockade Beaver Creek Reservoir Project, Level I, October, 1986. Executive Summary for this Report is in same notebook.

Bearlodge Ltd., Inc. Final Report, Stockade Beaver Creek Reservoir, Level I, November, 1986.

UPTON WATER SUPPLY

Weston Engineering, Inc. Upton Water Supply Project, Level II, October, 1990.

Weston Engineering, Inc. Upton Water Supply Project, Level II, May 30, 1991.

Weston Engineering, Inc. Executive Summary, Upton Water Supply Project, Level II, May 30, 1991.

VISTA WEST

Baker & Associates. Vista West Water Supply Project Level I Study, October, 1991.

Baker & Associates. Vista West Water Supply Project, Level I Study, Executive Summary, October, 1991.

Weston Engineering. Executive Summary, Groundwater Exploration Program for the Community of Vista West, Bearlodge Mountains, Wyoming, December, 1992.

Weston Engineering. Executive Summary, Vista West Water Supply Project, Level II, 1994.

Weston Engineering. Final Report, Vista West Water Supply Project, Level II 1994.

WRIGHT

Anderson & Kelly. Wright Groundwater Supply Project, Level II, Drilling and Testing of RJ-4 Well, Operating Plan and Preconstruction Report, 1986.

Anderson & Kelly. Executive Summary, Wright Groundwater Supply Project, Level II, Drilling and Testing of RJ-4 Well, Operating Plan and Preconstruction Report, 1986.

Anderson & Kelly. Wright Groundwater Supply Project, Level III, 1986.

Anderson & Kelly. Wright Groundwater Supply Project, Level III Executive Summary, 1986.

Anderson & Kelly. Summary of Wright Groundwater Supply Project, Level III, November, 1986.

YELLOWSTONE BASIN

Missouri River Basin Commission. Report on the Yellowstone Basin and Adjacent Coal Area, Level B Study, Wind-Bighorn- Clarks Fork, April, 1978.


Northeast River Basin Reference Notebook Table of Contents
Wyoming State Water Plan Homepage | Search the State Water Plan Website